<nav id="modma"><table id="modma"></table></nav>
    <sub id="modma"></sub>
    <wbr id="modma"><source id="modma"><dl id="modma"></dl></source></wbr>
    <tr id="modma"><p id="modma"><s id="modma"></s></p></tr>
    1. <wbr id="modma"></wbr>

    2. <sub id="modma"><table id="modma"></table></sub>
      <dd id="modma"><address id="modma"></address></dd>
    3. <nav id="modma"><address id="modma"></address></nav>

    4. <dd id="modma"></dd>
    5. EN

      Solutions

      Energy Management for Remote Sites

      Meralco is the largest electric distribution utility in Philippines. They power 5.6 million customers and the sales revenue was US$ 7.0 billion in 2013. They was looking for a solution to monitor their remote customers' energy usage conditions and help them to get better management of their load profile to reduce Peak Demand Surcharges.


      On the other hand, Utility could control the demand within the designed capacity to avoid over-loading.




      Project Scope




      Meralco initiated a project to improve the service for their bulk tariff customers (>1MVA) by monitoring the customers' Energy Usage Conditions and send Email alarms when their demands went over a pre-defined setpoint. This project was to help customers get better management of their load profile to reduce Peak Demand Surcharges. On the other hand, Utility could control the demand within the designed capacity to avoid over-loading.



      Challenge




      Most of the monitoring locations were in remote areas with no landline or internet access. Wireless solution was the only option. However, the signal coverage in remote area was a major concern and the signal strength might vary with weather. Besides, the communication cost was another concern too.



      Solution & Result


      CET provided the solution for connecting the remote meters through different 3G networks. Given cost constraint, 3G APN network with private IP was recommended, instead of using static public IP. In considering the instability of signal strength, CET suggested to use the meters with data logging capabilities (PMC-630E), which could store data in non-volatile memory to avoid data loss in case of connection failure.


      Industrial smart solutions

      application area

      欧洲美女粗暴牲交免费观看,日韩精品无码一区二区三区,七十路熟女交尾hd,少妇毛又多又黑a片视频